1 00:00:04,070 --> 00:00:02,550 the crew just outside of the hatch of 2 00:00:06,389 --> 00:00:04,080 the quest airlock 3 00:00:08,310 --> 00:00:06,399 setting up their tools and tethers uh 4 00:00:10,150 --> 00:00:08,320 wheelock soon to begin 5 00:00:11,990 --> 00:00:10,160 to move over to external stowage 6 00:00:14,230 --> 00:00:12,000 platform number two along with caldwell 7 00:00:16,470 --> 00:00:14,240 dyson to begin the preparations for the 8 00:00:19,670 --> 00:00:16,480 removal of the spare pump module from 9 00:00:23,910 --> 00:00:19,680 its uh berthing location on that spare 10 00:00:28,150 --> 00:00:25,670 okay shannon you've got the clearance on 11 00:00:29,750 --> 00:00:28,160 my helmet to the lab correct 12 00:00:31,910 --> 00:00:29,760 i have reasonable clearance the crew 13 00:00:38,069 --> 00:00:31,920 lock bag on your brt is blocking my view 14 00:00:40,389 --> 00:00:39,350 yeah that's perfect 15 00:00:43,830 --> 00:00:40,399 okay 16 00:00:45,830 --> 00:00:43,840 need to come forward just a little bit 17 00:00:47,190 --> 00:00:45,840 maybe about uh 18 00:00:49,430 --> 00:00:47,200 uh 19 00:00:50,869 --> 00:00:49,440 20 centimeters or so if you do if you 20 00:00:52,150 --> 00:00:50,879 can take that 21 00:00:54,630 --> 00:00:52,160 okay i can bring you forward a little 22 00:00:56,549 --> 00:00:54,640 bit we'll see how far we can go 23 00:01:06,230 --> 00:00:56,559 left on the hand controller starting 24 00:01:11,429 --> 00:01:08,390 on the left side of your screen the j3 25 00:01:12,870 --> 00:01:11,439 j4 j5 connectors those are electrical 26 00:01:15,190 --> 00:01:12,880 connectors three out of the five that 27 00:01:39,190 --> 00:01:15,200 were mated earlier in today's spacewalk 28 00:01:44,230 --> 00:01:40,950 skip check is good 29 00:01:49,109 --> 00:01:46,710 at the four hour 21 minute mark into the 30 00:01:51,270 --> 00:01:49,119 spacewalk all four fluid lines now 31 00:01:52,789 --> 00:01:51,280 connected to the new spare pump module 32 00:01:54,870 --> 00:01:52,799 on the international space station's 33 00:01:56,709 --> 00:01:54,880 starboard truss 34 00:01:58,789 --> 00:01:56,719 the crew inside the international space 35 00:02:01,190 --> 00:01:58,799 station will remove that lab truss 36 00:02:03,350 --> 00:02:01,200 contingency jumper that was installed on 37 00:02:04,789 --> 00:02:03,360 the night of july 31st to transfer loads 38 00:02:07,350 --> 00:02:04,799 to loop b 39 00:02:10,550 --> 00:02:07,360 then the dc to dc converter units will 40 00:02:11,910 --> 00:02:10,560 be reactivated to re-power loop a and 41 00:02:14,309 --> 00:02:11,920 the pump module 42 00:02:17,030 --> 00:02:14,319 and other configurations will occur to 43 00:02:19,110 --> 00:02:17,040 bring back online the kibo 44 00:02:21,750 --> 00:02:19,120 japanese module systems as well as the 45 00:02:23,190 --> 00:02:21,760 european columbus module systems and by 46 00:02:25,510 --> 00:02:23,200 thursday 47 00:02:27,270 --> 00:02:25,520 all of the configuration activity will 48 00:02:29,589 --> 00:02:27,280 be complete and 49 00:02:31,589 --> 00:02:29,599 a final power jumper 50 00:02:33,190 --> 00:02:31,599 providing contingency power to the 51 00:02:35,990 --> 00:02:33,200 russian segment of the international 52 00:02:37,589 --> 00:02:36,000 space station will be removed and will